Seymen Power Plant
Client : Ortadoğu Enerji
Installed Power : 38.81 MWe
October 2020 Commissioning Date :

Actions Taken:
Gas engine assembly
Gas engine jacket water chiller design, manufacture and installation
Gas engine oil line design, manufacture and installation
Gas engine exhaust flue line design, manufacture and installation
Gas line piping design, fabrication and installation
Cooling water system design, manufacture and installation
Clean and dirty oil tank design, manufacturing, design and assembly

Seymen Power Plant